IMPORTANT, IF YOU ARE PLANNING PAVING WORKS

Color, shape, and finish are a matter of taste, but for the pavement to last long, the paving stone surface must be chosen according to the site’s operational requirements:

  • For sidewalks and private house yards, a 5-6 cm thick paving surface will suffice,
  • For driveways or parking lots, we recommend choosing 8-10 cm thick paving stones,
  • For industrial areas with heavy traffic loads, 10-12 cm thick paving.

Paving stones should be ordered with a reserve – 3-8% of the total paving volume.

Any paved area requires curbs – they not only serve decorative functions but also hold the paving in place to prevent it from slipping.

The paving should be jointed to prevent weeds and young saplings from settling in the gaps.

Paving must not be laid sooner than 5 days after production, loaded sooner than 7 days, and heavy machinery weighing more than 2 tons should not be allowed to drive on the paving sooner than 28 days.

Paving production information is located on the pallets.